ResourcesAbout
ResourcesAbout
Carbon

Aclearerpictureofyourproject’scarbon.

Carbon information comes from a lot of places: fuel, electricity, transport, machinery and materials. WasteX helps bring the supporting records together, so project teams can calculate, understand and report the emissions they have information for.

Illustrative example. Names and figures are not real.
Overview
Waste
Carbon
Compliance
Reports
Northcote Development Project
Illustrative data
Live project
Total emissions
88.1tCO₂e
Calculated from submitted data
Transport and haulage
41.2tCO₂e
Largest source
Plant and equipment fuel
28.6tCO₂e
From fuel records
Emissions by source
Transport41.2
Plant fuel28.6
Electricity11.4
Deliveries6.9
How a figure was worked out
Activity dataRemoval trip · 22 kmRecorded
Emission factorMatched to vehicle typeApplied
ResultCalculated from the recordDone

It starts with the records you already have.

Carbon figures are hard to produce because the inputs are scattered. Fuel invoices sit with the accounts team, delivery dockets sit on site, and power bills sit somewhere in a shared drive.

WasteX works from the activity data your project already generates, applies emission factors to it, and shows the working. You get a number, and you can see where it came from and what was assumed.

Emissions by sourceIllustrative data
0.0
tCO₂e · calculated from records
Transport41.2
Plant fuel28.6
Electricity11.4
Deliveries6.9
Worked out from recorded activity and emission factors.

See where the emissions come from.

A total on its own doesn’t tell a project team much. Broken down by source, it shows them where to look.

The working behind each figure

Every figure is worked out from a recorded activity, an emission factor and a unit, so the method is consistent from one report to the next.

Transport, fuel and energy

Delivery and removal trips carry distance and vehicle type. Your team enters fuel, machinery hours and metered electricity, with a photo of the paperwork if there is one.

Assumptions in the open

Where a figure is estimated rather than confirmed, it says so. The method stays the same from one report to the next.

Built for the people who have to report it.

The workflow assumes the person producing the report is not the person who generated the data.

01

Collect the activity

Trips, fuel, energy and material movements come in from the records your project already produces.

02

Apply the factor

Each activity is matched to an emission factor for its type, and the unit is carried through the calculation.

03

Break it down

Totals split by source and by site, so a spike has somewhere to be traced back to.

04

Export with the working

Reports show the sources behind the totals, which is what a reviewer asks for first.

Emissions are calculated from submitted activity data using emission factors. They are not directly measured, and coverage depends on which sources your project records. WasteX does not replace specialist verification. It puts the inputs, factors and working in one place, so a verifier has something to review.

Who ends up using it

Sustainability managers
Who need to see which sources are driving a project’s footprint, not just the total at the bottom.
Carbon practitioners
Who want the factor, the unit and the activity visible so the method survives review.
Contractors
Who are being asked for emissions data by clients and need a repeatable way to produce it.
Developers and principals
Who are comparing projects and want the same basis used across all of them.

Common questions

If yours isn’t here, ask us on a demo call.

Deliveries, removals and the trips that carry them, machinery, and water and energy use, as long as your project records them. Coverage follows the data you submit.

Activity data is multiplied by an emission factor matched to the activity type. The factor, the unit and the input are shown next to the result, so the calculation can be checked.

No. They are calculated from activity data and emission factors, and the page says so. A number presented as measured when it was calculated is the quickest way to lose a reviewer’s trust.

Yes. Reports run for a single site, or roll up across your company.

No. If your project needs third-party verification or a formal assurance process, WasteX is what you hand the verifier: the inputs, factors and working in one place.

Part of one platform

The same records sit under every page of WasteX.

Knowyoursite.

Every material. Every machine. Every tonne of carbon.